Resource Type

Journal Article 1162

Conference Videos 44

Conference Information 1

Year

2024 1

2023 62

2022 96

2021 97

2020 70

2019 69

2018 66

2017 69

2016 69

2015 49

2014 43

2013 56

2012 41

2011 62

2010 59

2009 52

2008 50

2007 39

2006 28

2005 18

open ︾

Keywords

Three Gorges Project 33

design 29

project management 23

construction 12

multi-objective optimization 12

optimization 12

Three Gorges Project ship lift 9

ship lift 8

genetic algorithm 7

innovation 7

robust design 7

Additive manufacturing 6

Machine learning 6

Software-defined networking (SDN) 6

design optimization 6

optimization design 6

simulation 6

construction management 5

construction project 5

open ︾

Search scope:

排序: Display mode:

The dam design of Three Gorges Project

Wang Xiaomao,Xu Linxiang,Liao Renqiang

Strategic Study of CAE 2011, Volume 13, Issue 7,   Pages 70-77

Abstract:

The dam of Three Gorges Project is a concrete gravity dam with the crestSome key techniques relating to dam structure design are presented, including hydraulics of flood dischargestructure, joint design, layout and structural style of penstock, deep antisliding stability of dam

Keywords: Three Gorges Project     dam     design    

The Examination of the Technical Design of the Navigation Construction in the Three Gorges Project

Liang Yingchen

Strategic Study of CAE 2000, Volume 2, Issue 5,   Pages 34-43

Abstract:

The Three Gorges Project (TGP) is the greatest water conservancy engineering being built in the worldEach of the technical design and the engineering constuction in the project can be a worldwide key technical

Based on the overall examination of the Three Gorges Project navigation construction technicaldesign, which started in 1994, the following 6 topics are described and discussed: 1) the general layoutthe permanent ship lock; 5) shiplift; 6) scientific research and its achievement during the technical design

Keywords: Three Gorges Project     technical design     navigation construction     permanent shiplock     shiplift    

Looking Back and Prospecting to the Project Design ofthe Spaceflight Launching Site in China

Zhang Zeming

Strategic Study of CAE 2007, Volume 9, Issue 4,   Pages 1-5

Abstract:

This paper introduces the development history of the project design ofspaceflight launching site in China and the main forms used in the design, and points out that thereChina should, according to its national condition, design and build the launching project facility and

Keywords: launching site     project design     development history     integrated mode    

Evidence from the Hong Kong-Zhuhai-Macao Bridge project in China

Jinwen ZHANG, Yumin QIU

Frontiers of Engineering Management 2018, Volume 5, Issue 1,   Pages 40-51 doi: 10.15302/J-FEM-2018083

Abstract: analyzes the complex integrity of the island-tunnel subproject of the Hong Kong-Zhuhai-Macao Bridge (HZMB) projectand proposes an improved design-build (DB) mode in which the owner provides a preliminary design and

Keywords: Hong Kong-Zhuhai-Macao Bridge project     island-tunnel subproject     complex integrity     complexity degradation     the general contracting mode of design-build     the design-build consortium    

Mechanism design of reverse auction on concession period and generalized quality for PPP projects

Xianjia WANG, Shiwei WU

Frontiers of Engineering Management 2017, Volume 4, Issue 2,   Pages 156-170 doi: 10.15302/J-FEM-2017016

Abstract: Thus, the multidimensional reverse auction model of a PPP project can be replaced by a two-dimensional

Keywords: PPP project     reverse auction     mechanism design     multidimensional information     scoring function     two-stage    

Evaluation of the contract reliability for alternative infrastructure project delivery: a contract engineering

Bing WANG, Qingbin CUI, Shuibo ZHANG

Frontiers of Engineering Management 2019, Volume 6, Issue 2,   Pages 239-248 doi: 10.1007/s42524-019-0018-3

Abstract: increasingly motivating the private sector to participate in infrastructure development using alternative projectdesigning contracts, governments usually offer incentives while requiring cost or time guarantee to balance projectHowever, a practical and critical problem is how to properly design these provisions.The New Mexico Highway 44 project, in which three warranty provision arrangements are investigated, isof the ceiling clause and the warranty option will therefore result in improved contract provision design

Keywords: infrastructure development     contract design     contract reliability     guarantee provision     contract engineering    

Design and construction of steel roof truss on top of Three Gorges Project ship lift machine room

Sun Changzhong

Strategic Study of CAE 2013, Volume 15, Issue 9,   Pages 33-39

Abstract: style="text-align: justify;">According to the use of the steel roof truss on top of the Three Gorges ProjectThe safety of steel roof structure and its design scheme is verified by using the establishment of three-dimensionalconstruction procedure and construction equipment selection are formulated which is suitable for Three Gorges ProjectThe structure design method and construction scheme of the steel roof of Three Gorges Project ship lift

Keywords: ship lift     computer room     steel roof truss     design     construction     Three Gorges Project    

The resettlement planning and practice of Three Gorges Project

Shi Boxun,Ying Zhongwu,Wang Diyou

Strategic Study of CAE 2011, Volume 13, Issue 7,   Pages 123-128

Abstract:

The key to success of Three Gorges Project is the migrant resettlement

Keywords: Three Gorges Project     reservoir resettlement     planning and design     relocation and resettlement     compensationand development     effect of resettlementThree Gorges Project     reservoir resettlement     planning and design    

The research and practice of key technological issues in structure design of Three Gorges Project

Zheng Shouren,Niu Xinqiang

Strategic Study of CAE 2011, Volume 13, Issue 7,   Pages 20-27

Abstract:

The dam of Three Gorges Project is characterized by large flood dischargeThere is a lack of practical experiences in the design and construction of asphalt concrete core wallFor the double-line five-step ship-lock, the design of fully lined ship-lock, high head delivery system

Keywords: Three Gorges Project     structure     design     key techniques     practice    

The design of double line five step ship-lock of Three Gorges Project

Niu Xingqiang,Tong Di,Song Weibang

Strategic Study of CAE 2011, Volume 13, Issue 7,   Pages 85-90

Abstract:

The general design and layout of the double line five step ship lockscale miter gates and hoisting equipment under complicated operation conditions of the Three Gorges ProjectSince the operation of ship lock in 2003, the operation practice has proved that the design techniquesThe design and construction of the fully lined ship lock promotes the development of design theory and

Keywords: Three Gorges Project     double-line five-step     design of ship-lock    

The “Tiangong” Chinese Space Station project

Yang HONG

Frontiers of Engineering Management 2018, Volume 5, Issue 2,   Pages 278-283 doi: 10.15302/J-FEM-2018202

Keywords: manned space station     space station project     basic design    

Design guidelines for urea hydrolysers for ammonia demand of the SCR DENOX project in coal-fired power

Peng ZHENG, Xuan YAO, Wei ZHENG

Frontiers in Energy 2013, Volume 7, Issue 1,   Pages 127-132 doi: 10.1007/s11708-012-0225-7

Abstract: However, ammonia is the most common reactant in the DENOX project to eliminate NO in the flue gas.Presently, there is still no self-depended mature urea hydrolysis technology for the DENOX project inChina; therefore, this paper proposes several guidelines to design the urea hydrolyser by theoretical

Keywords: urea     hydrolyser     ammonia     selective catalytic reduction (SCR)    

Optimization design of anti-seismic engineering measures for intake tower based on non-dominated sorting

Frontiers of Structural and Civil Engineering   Pages 1428-1441 doi: 10.1007/s11709-023-0998-2

Abstract: anti-seismic scheme combination by comprehensively considering the dynamic tower response and variable projectFinally, the rationality of the original intake tower antiseismic design scheme was evaluated according

Keywords: NSGA-II     mode decomposition response spectrum method     anti-seismic engineering measures     optimization design     variable project cost    

Optimal risk allocation in alliance infrastructure projects: A social preference perspective

Xiang DING, Qian LI

Frontiers of Engineering Management 2022, Volume 9, Issue 2,   Pages 326-336 doi: 10.1007/s42524-020-0145-x

Abstract: The mechanism of risk allocation is designed to protect all stakeholders, and it is vital to projectmodeling alliance member (AM)’s inequity aversion (IA) to analyze risk-sharing arrangements in an alliance project

Keywords: public project     contract design     risk sharing     inequity aversion     governance    

The construction design and practice of Three Gorges Project

Wen Yonghong,Xie Xiangrong,Fan Wuyi

Strategic Study of CAE 2011, Volume 13, Issue 7,   Pages 111-116

Abstract:

The construction of Three Gorges Project (TGP) is characterized by largeconcrete (RCC) cofferdam in 3-stage III and double line five step ship lock,the general arrangement of the projectfollows:construction in 3-stage,navigation with diversion channel and power generation under cofferdam project.The

Keywords: Three Gorges Project     construction     diversion     earth rock     concrete    

Title Author Date Type Operation

The dam design of Three Gorges Project

Wang Xiaomao,Xu Linxiang,Liao Renqiang

Journal Article

The Examination of the Technical Design of the Navigation Construction in the Three Gorges Project

Liang Yingchen

Journal Article

Looking Back and Prospecting to the Project Design ofthe Spaceflight Launching Site in China

Zhang Zeming

Journal Article

Evidence from the Hong Kong-Zhuhai-Macao Bridge project in China

Jinwen ZHANG, Yumin QIU

Journal Article

Mechanism design of reverse auction on concession period and generalized quality for PPP projects

Xianjia WANG, Shiwei WU

Journal Article

Evaluation of the contract reliability for alternative infrastructure project delivery: a contract engineering

Bing WANG, Qingbin CUI, Shuibo ZHANG

Journal Article

Design and construction of steel roof truss on top of Three Gorges Project ship lift machine room

Sun Changzhong

Journal Article

The resettlement planning and practice of Three Gorges Project

Shi Boxun,Ying Zhongwu,Wang Diyou

Journal Article

The research and practice of key technological issues in structure design of Three Gorges Project

Zheng Shouren,Niu Xinqiang

Journal Article

The design of double line five step ship-lock of Three Gorges Project

Niu Xingqiang,Tong Di,Song Weibang

Journal Article

The “Tiangong” Chinese Space Station project

Yang HONG

Journal Article

Design guidelines for urea hydrolysers for ammonia demand of the SCR DENOX project in coal-fired power

Peng ZHENG, Xuan YAO, Wei ZHENG

Journal Article

Optimization design of anti-seismic engineering measures for intake tower based on non-dominated sorting

Journal Article

Optimal risk allocation in alliance infrastructure projects: A social preference perspective

Xiang DING, Qian LI

Journal Article

The construction design and practice of Three Gorges Project

Wen Yonghong,Xie Xiangrong,Fan Wuyi

Journal Article